Select the lab number or panel name from the Lab or Panel list.
If using the Lab option, select the lot number from the Lot list.
Select the test from the Test list.
Click Set Date.
Click any part of the date and type over to edit the date for the first date of data entry, or
Click the arrow located to the right of the date and select a date from the calendar for the first date of data entry.
Click in the first Level field and type the value for the level.
Press the TAB or ENTER key on the keyboard to go to the next Level field.
Repeat steps 7 and 8 as neededto enter data for all levels.
When pressing the TAB or ENTER key on the keyboard in the last level of the row, Unity Real Time™ online:
Goes to the first field on the next row.
Evaluates the data points against active SPC rules and indicates the rule status (accept, warn, reject).
Updates the Summary Statistics.
Continue entering data for the test.
Click Save after all data has been entered for the test.
Click the appropriate navigation button to continue entering data for other labs, lots, and tests. Make sure to click Save before navigating to ensure the data is saved.